MARCUS CONST & SUPPLY 12601 is listed as a company organization in Philippine public procurement records on this site, with 24 linked DPWH project(s) totaling about ₱1,283,624,704.91. No delivery grade published yet (insufficient linked public records).
MARCUS CONST & SUPPLY 12601
N/GRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 24
- Total value
- ₱1,283,624,704.91
- Published flags
- 0
- Region
- Cotabato 1st DEO · Region XII
Public Record Grade
A transparent, data-derived summary of reported public records for MARCUS CONST & SUPPLY 12601 — not an accusation or finding of wrongdoing.
Not graded yet — the Public Record Grade has not been computed for this contractor.
Computed automatically from public DPWH, PhilGEPS, and COA records. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
24 geotagged project(s) — Open full map
- ROAD WIDENING BUKIDNON-COTABATO ROAD K1615+357-K1617+996, CARMEN, NORTH COTABATO22M00011 · ₱91,433,823.60 · mapped
- CONSTRUCTION OF KABACAN RIVER FLOOD CONTROL PROJECT (CARABAO CENTER-RIGHT SIDE), STA. 0+000-STA0+662.11, USM, KABACAN, COTABATO23M00157 · ₱88,576,426.12 · mapped
- CONSTRUCTION OF PULANGI RIVER FLOOD CONTROL PROJECT (UGALINGAN SECTION-PHASE IV), UGALINGAN, CARMEN, COTABATO19MD0031 · ₱86,791,202.82 · mapped
- CONST. OF FLOOD MITIGATION STRUCTURE - CONST. OF UGALINGAN FLOOD CONTROL PROJECT II (RIVER BANK PROTECTION W/REVETMEN), UGALINGAN, CARMEN, COTABATO18MD0078 · ₱76,539,346.76 · mapped
- ROAD WIDENING ALONG BUKIDNON-COTABATO ROAD K1636 + 934 K1637 + 870, K1639 + 1000 K1642 +065, CARMEN, NORTH COTABATO20M00144 · ₱72,830,964.65 · mapped
- CONSTRUCTION OF KABACAN RIVER BANK PROTECTION (UPSTREAM OF LUMAYONG BRIDGE, LEFT SIDE), STA 0+000 - STA 0+540.71, PHASE I, KABACAN, NORTH COTABATO23M00155 · ₱72,183,912.46 · mapped
- CONSTRUCTION OF BUAL RIVER BANK PROTECTION, PHASE I, STA. 0+000 - STA. 0+504.663, BARANGAY BUAL, TULUNAN, COTABATO23M00150 · ₱67,477,953.17 · mapped
- CLUSTER VII-A.CONSTRUCTION OF RIVER BANK PROTECTION ALONG BANGA RIVER, BRGY. PUTI, NORALA, SOUTH COTABATO B.CONSTRUCTION OF RIVER BANK PROTECTION ALONG BANGA RIVER, BRGY. PUNONG GRANDE, BANGA, SOUTH COTABATO21MG0099 · ₱59,686,528.62 · mapped
- ROAD WIDENING ALONG BUKIDNON-COTABATO ROAD, BRGY. AROMAN, CARMEN, NORTH COTABATO19MD0040 · ₱58,794,555.00 · mapped
- CONCRETING OF ROADS, BARANGAY KIBUDTUNGAN (SITIO TAWAGON TO SITIO CUMANTI), CARMEN, NORTH COTABATO.20M00155 · ₱49,500,000.00 · mapped
- CONSTRUCTION OF ROAD, KATIDTUAN - DAGUPAN - ARINGAY ROAD, KABACAN, NORTH COTABATO22MI0014 · ₱48,999,994.17 · mapped
- CONST. OF USM KABACAN FLOOD CONTROL ALONG KABACAN RIVER, USM KABACAN, COTABATO15MD0280 · ₱48,488,191.38 · mapped
- ROAD WIDENING - BUKIDNON - COTABATO RD - K1631+411 - K1632+799, K1632+842 - K1632+992, K1642+065 - K1642+462, CARMEN, NORTH COTABATO21MI0041 · ₱48,249,933.96 · mapped
- CONST. OF LUMAYONG FC (RIVER BANK PROTECTION W/ REVETMENT) ALONG BUK-COT RD, LUMAYONG, CARMEN, COTAB15MD0288 · ₱47,425,485.84 · mapped
- CONST. OF LUMAYONG FLOOD CONTROL PROJECT, KABACAN, COTABATO15MD0281 · ₱47,387,311.92 · mapped
- CONST. OF KABACAN FLOOD CONTROL PROJECT II ALONG KABACAN RIVER, USM, KABACAN, COTABATO17MD0023 · ₱46,647,198.02 · mapped
- CONST. OF LUMAYONG FLOOD CONTROL PROJECT II, LUMAYONG, KABACAN, COTABATO17MD0024 · ₱46,646,735.16 · mapped
- CONSTRUCTION OF PULANGI RIVER FLOOD CONTROL PROJECT (UGALINGAN SECTION-PHASE III), UGALINGAN, CARMEN, COTABATO19MD0033 · ₱46,543,250.25 · mapped
- CONSTRUCTION OF CONCRETE ROAD ALONG SAYRE ROAD-SITIO TAWAGON-KILAMBAY, BRGY. KIBUDTUNGAN CONNECTING TO SALAMA, BANISILAN ROAD IN SUPPORT OF COCONUT PROCESSING INDUSTRY (TREE LIFE ORGANIC COCO SUGAR), CARMEN, NORTH COTABATO20M00145 · ₱38,598,739.73 · mapped
- ROAD WIDENING - BUKIDNON - COTABATO ROAD, KIBUDTUNGAN, CARMEN, NORTH COTABATO18MD0072 · ₱37,267,764.77 · mapped
- KIDAPAWAN-CALUNASAN-MLANG RD - K1634+775-K1634+90025MI0078 · ₱29,231,357.51 · mapped
- CONSTRUCTION OF CONCRETE REVETMENT ALONG DIGOS RIVER, RUPARAN SECTION, DIGOS CITY, DAVAO DEL SUR18LD0032 · ₱28,502,952.31 · mapped
- CONST. OF FLOOD MITIGATION STRUCTURE - CONST. OF LUMAYONG FLOOD CONTROL (UPSTREAM OF CARMEN BRIDGE), LUMAYONG, CARMEN, COTABATO18MD0077 · ₱26,531,385.26 · mapped
- REHABILITATION OF SITIO SAN ROQUE, BANGKAL-GUMITUYOM-SITIO KILONG, MANGA FMR, MATANAO, DAVAO DEL SUR17LD0056 · ₱19,289,691.43 · mapped
