CONSTRUCTION OF FLOOD CONTROL STRUCTURES INCLUDING DESILTING/DREDGING ALONG SAN MIGUEL RIVER, STA. RITA SECTION PHASE II, SAN MIGUEL, BULACAN
CONSTRUCTION OF FLOOD CONTROL STRUCTURES INCLUDING DESILTING/DREDGING ALONG SAN MIGUEL RIVER, STA. RITA SECTION PHASE II, SAN MIGUEL, BULACAN is a DPWH-tracked public work in Bulacan 2nd DEO, Region III. Reported contract value: ₱77,199,814.74. Status: Reported complete (DPWH). Contractor on record: ATLAS GEN CONST. Figures trace to dpwh.
Total Contract Cost
