CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF WASIG RIVER CONTROL STRUCTURE, BARANGAY WASIG, MANSALAY, ORIENTAL MINDORO
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF WASIG RIVER CONTROL STRUCTURE, BARANGAY WASIG, MANSALAY, ORIENTAL MINDORO is a DPWH-tracked public work in Southern Mindoro DEO, Region IV-B. Reported contract value: ₱29,044,880.17. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: LEWIS GJANN CONST 54135. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
