CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF FLOOD CONTROL ALONG CAMPOKPOK RIVERBRGY. CAMPOKPOK, TABANGO, LEYTE
CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF FLOOD CONTROL ALONG CAMPOKPOK RIVERBRGY. CAMPOKPOK, TABANGO, LEYTE is a DPWH-tracked public work in Leyte 3rd DEO, Region VIII. Reported contract value: ₱18,952,395.48. Status: Reported complete (DPWH). Contractor on record: RJIR ENT CORP. Figures trace to dpwh.
Total Contract Cost
