CY-2019 CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEM - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALIWAG RIVERSECTION 1 ; STA.0+000.00 - STA.0+170.00SECTION 2 : STA.0+285.00 - STA.0+550.00SITIO BALIWAG, BURABOD, LAG
CY-2019 CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEM - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALIWAG RIVERSECTION 1 ; STA.0+000.00 - STA.0+170.00SECTION 2 : STA.0+285.00 - STA.0+550.00SITIO BALIWAG, BURABOD, LAG is a DPWH-tracked public work in Camarines Sur 4th DEO, Region V. Reported contract value: ₱23,292,289.19. Status: Reported complete (DPWH). Contractor on record: E A SANCHO CONST INC FORM E A SANCHO CONST. Figures trace to dpwh.
Total Contract Cost