CONSTRUCTION OF ARAMAYWAN RIVER FLOOD CONTROL STRUCTURE, NARRA, PALAWAN.
CONSTRUCTION OF ARAMAYWAN RIVER FLOOD CONTROL STRUCTURE, NARRA, PALAWAN. is a DPWH-tracked public work in Palawan 2nd DEO, Region IV-B. Reported contract value: ₱36,495,691.67. Status: Reported complete (DPWH). Contractor on record: C T LEONCIO CONST. Figures trace to dpwh.
Total Contract Cost
