CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TERESA RIVER (STA. 14 + 540 - STA. 15 + 672, R/S), BARANGAY BAGUMBAYAN, TERESA, RIZAL
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TERESA RIVER (STA. 14 + 540 - STA. 15 + 672, R/S), BARANGAY BAGUMBAYAN, TERESA, RIZAL is a DPWH-tracked public work in Region IV-A, Region IV-A. Reported contract value: ₱96,499,985.16. Status: Past target date (DPWH On-Going). Contractor on record: DOUBLE 12 CONST. Figures trace to dpwh.
Total Contract Cost

