REHABILITATION/RECONST OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE: EASTERNLINK CIRCUMFERENTIAL ROAD (S00518LZ) 1. CH. 1030-CH. 1080 2. CH. 1120-CH. 1170 3. CH. 1620- CH. 1640 4. CH. 1700-CH. 1740 5. CH 2400-CH. 2470
REHABILITATION/RECONST OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE: EASTERNLINK CIRCUMFERENTIAL ROAD (S00518LZ) 1. CH. 1030-CH. 1080 2. CH. 1120-CH. 1170 3. CH. 1620- CH. 1640 4. CH. 1700-CH. 1740 5. CH 2400-CH. 2470 is a DPWH-tracked public work in Baguio City DEO, Cordillera Administrative Region. Reported contract value: ₱22,564,943.29. Status: Reported complete (DPWH). Contractor on record: MG SAMIDAN CONST 33234. Figures trace to dpwh.
Total Contract Cost
