CONSTRUCTION OF FLOOD CONTROL ALONG MESTIZO RIVER, BRGY. CALLAGUIP, CAOAYAN, ILOCOS SUR
CONSTRUCTION OF FLOOD CONTROL ALONG MESTIZO RIVER, BRGY. CALLAGUIP, CAOAYAN, ILOCOS SUR is a DPWH-tracked public work in Ilocos Sur 1st DEO, Region I. Reported contract value: ₱11,633,249.80. Status: Reported complete (DPWH). Contractor on record: 739 BUILDERS 31174. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
