CONSTRUCTION OF FLOOD CONTROL WALL/RIPRAPPING ALONG THE BANK OF CREEKS ALONG BRGY. 178 (PHASE 2), CALOOCAN CITY
CONSTRUCTION OF FLOOD CONTROL WALL/RIPRAPPING ALONG THE BANK OF CREEKS ALONG BRGY. 178 (PHASE 2), CALOOCAN CITY is a DPWH-tracked public work in Metro Manila 3rd DEO, National Capital Region. Reported contract value: ₱28,215,944.26. Status: Reported complete (DPWH). Contractor on record: IM CONST CORP. Figures trace to dpwh.
Total Contract Cost
