UPGRADING (UNPAVED TO PAVED) OF ZAMBOANGA DEL SUR COASTAL ROAD BUBURAY-SUMPOT SECTION, ZAMBOANGA DEL SUR, STA. 25+061.00 TO STA. 28+500.00 (NET LENGTH = 3,439.00 LN.M.)
UPGRADING (UNPAVED TO PAVED) OF ZAMBOANGA DEL SUR COASTAL ROAD BUBURAY-SUMPOT SECTION, ZAMBOANGA DEL SUR, STA. 25+061.00 TO STA. 28+500.00 (NET LENGTH = 3,439.00 LN.M.) is a DPWH-tracked public work in Region IX, Region IX. Reported contract value: ₱82,173,744.23. Status: Reported complete (DPWH). Contractor on record: ED1SON DEVELOPMENT. Figures trace to dpwh.
Total Contract Cost
