Flood Control and Drainage19CI0094

LOCAL PROGRAM;FLOOD CONTROL AND DRAINAGE;FLOOD CONTROL STRUCTURES/FACILITIES;CONST OF REINFORCED CONCRETE SLOPE PROTECTION ALONG SAPANGBALEN CREEK,MABALACAT CITY,PAMPANGA

LOCAL PROGRAM;FLOOD CONTROL AND DRAINAGE;FLOOD CONTROL STRUCTURES/FACILITIES;CONST OF REINFORCED CONCRETE SLOPE PROTECTION ALONG SAPANGBALEN CREEK,MABALACAT CITY,PAMPANGA is a DPWH-tracked public work in Pampanga 3rd DEO, Region III. Reported contract value: ₱48,996,845.56. Status: Reported complete (DPWH). Contractor on record: AL-B DEVELOPMENT CORP. Figures trace to dpwh.

Pampanga 3rd DEO, Region III
Region: Region III

Money Trail

1. Appropriation

GAA FY2019 not yet loaded (source: DBM GAA)

2. Allotment

No SARO/NCA release rows linked to this project yet. See DBM release listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

64 projects · ₱1.6B total · 0 flags

Other projects by this contractor

FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG ABACAN RIVER, BARANGAY SAPALIBUTAD, ANGELES CITY, PAMPANGA

Pampanga 3rd DEO, Region III

2025₱96.6M
Reported complete (100% progress, DPWH status On-Going)

Construction of Reinforced Concrete Slope Protection Structure along Abacan River, Barangay Pampang, Angeles City, Pampanga

ANGELES CITY (PAMPANGA), PAMPANGA, Region III

2024₱96.5M
Reported complete (DPWH)
No sat.

Construction of Slope Protection Structure along Abacan River, Barangays Malabanas to Anunas, Angeles City, Pampanga

ANGELES CITY (PAMPANGA), PAMPANGA, Region III

2023₱67.5M
Reported complete (DPWH)
No sat.

FLOOF MANAGEMENT PROGRAM; CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS; CONSTRUCTION OF FLOOD CONTROL STRUCTURE IN ANGELES CITY, PAMPANGA (PHASE I)

Pampanga 3rd DEO, Region III

2024₱62.7M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL PROGRAM; CONST/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES;ANGELES CITY TOLL EXIT CONNECTING NLEX AND SCTEX IN SUPPORT OF HANDICRAFT, FURNITURE,MANUFACTURING,HOTEL, IT-IBPM GARMENTS AND TEXTILES IND

Pampanga 3rd DEO, Region III

2020₱57.9M
Reported complete (DPWH)
No sat.

Construction of Reinforced Concrete Slope Protection with Steel Sheet Piles Foundation along Abacan River, Brgy. Tabun to Capaya, Angeles City, Pampanga - Sta. 1+949 - Sta. 2+699

ANGELES CITY (PAMPANGA), PAMPANGA, Region III

2022₱56.0M
Reported complete (DPWH)
View all 64 projects →

4. Implementation

Contract Amount

₱48,996,845.56

Progress

Reported complete (DPWH)

Start Date

July 5, 2019

Target End

February 29, 2020

5. Audit