Rehabilitation of Flood Control Structures along Guiguinto River, Malis Section, Guiguinto, Bulacan
Rehabilitation of Flood Control Structures along Guiguinto River, Malis Section, Guiguinto, Bulacan is a DPWH-tracked public work in GUIGUINTO (BULACAN), BULACAN, Region III. Reported contract value: ₱45,077,524.96. Status: Reported complete (DPWH). Contractor on record: TOPNOTCH CATALYST BUILDERS INC / BLACK HARDHAT INC FORMERLY: JCHARDHAT INC. Figures trace to sumbong.
Total Contract Cost



