CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, RIPANG SECTIONSTA. 35+489 - STA. 36+564 (R.S.)
CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CHICO RIVER BASIN, RIPANG SECTIONSTA. 35+489 - STA. 36+564 (R.S.) is a DPWH-tracked public work in Cordillera Administrative Region, Cordillera Administrative Region. Reported contract value: ₱95,042,609.73. Status: Past target date (DPWH On-Going). Contractor on record: RODEKOM GEN CONST AND ENT 38656. Figures trace to dpwh.
Total Contract Cost
