CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PULA RIVER AT BARANGAY SANTO NINO-PAGALAGALA-SANTA MARIA AND PAMBISAN MALAKI, STA. 0+376.40-STA. 1+156.85,ORIENTAL MINDORO
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PULA RIVER AT BARANGAY SANTO NINO-PAGALAGALA-SANTA MARIA AND PAMBISAN MALAKI, STA. 0+376.40-STA. 1+156.85,ORIENTAL MINDORO is a DPWH-tracked public work in Region IV-B, Region IV-B. Reported contract value: ₱96,490,000.00. Status: Reported complete (DPWH). Contractor on record: E E CONST. Figures trace to dpwh.
Total Contract Cost
