Construction of Drainage Structure (Line Canal with Cover), Brgy. 3, Barangay III - Poblacion, Malilipot, Albay
Construction of Drainage Structure (Line Canal with Cover), Brgy. 3, Barangay III - Poblacion, Malilipot, Albay is a DPWH-tracked public work in MALILIPOT (ALBAY), ALBAY, Region V. Reported contract value: ₱4,900,000.00. Status: Reported complete (DPWH). Contractor on record: 3DIAMONDS CONST CORP. Figures trace to sumbong.
Total Contract Cost

