CONSTRUCTION / EXTENSION OF CATARMAN FLOOD CONTROL STRUCTURES, CATARMAN RIVER BASIN (DOWNSTREAM), SAMPAGUITA - ABAD SANTOS, CATARMAN, NORTHERN SAMAR 1ST LD
CONSTRUCTION / EXTENSION OF CATARMAN FLOOD CONTROL STRUCTURES, CATARMAN RIVER BASIN (DOWNSTREAM), SAMPAGUITA - ABAD SANTOS, CATARMAN, NORTHERN SAMAR 1ST LD is a DPWH-tracked public work in Region VIII, Region VIII. Reported contract value: ₱77,121,199.88. Status: Reported complete (DPWH). Contractor on record: EZJONES CONST INC 34462. Figures trace to dpwh.
Total Contract Cost
