CONSTRUCTION OF FLOOD CONTROL SYSTEM ALONG BARIW RIVER (DOWNSTREAM), BRGY. BARIW, CAMALIG, ALBAY
CONSTRUCTION OF FLOOD CONTROL SYSTEM ALONG BARIW RIVER (DOWNSTREAM), BRGY. BARIW, CAMALIG, ALBAY is a DPWH-tracked public work in Albay 2nd DEO, Region V. Reported contract value: ₱9,311,997.61. Status: Reported complete (DPWH). Contractor on record: STEVEN CONST. Figures trace to dpwh.
Total Contract Cost
