CONST. OF IPONAN FLOOD CONTROL PROJECT(DOWNSTREAM OF IPONAN BRIDGE III),BULUA SIDE, INCL. ROW, CDOC
CONST. OF IPONAN FLOOD CONTROL PROJECT(DOWNSTREAM OF IPONAN BRIDGE III),BULUA SIDE, INCL. ROW, CDOC is a DPWH-tracked public work in Region X, Region X. Reported contract value: ₱63,690,000.00. Status: Reported complete (DPWH). Contractor on record: EQUI-PARCO CONST CO. Figures trace to dpwh.
Total Contract Cost