CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MARANGLA RIVER UPSTREAM (LEFT SIDE), BARANGAY SAN AGUSTIN, IBA, ZAMBALES, PHASE 2
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MARANGLA RIVER UPSTREAM (LEFT SIDE), BARANGAY SAN AGUSTIN, IBA, ZAMBALES, PHASE 2 is a DPWH-tracked public work in Zambales 1st DEO, Region III. Reported contract value: ₱47,613,106.26. Status: Past target date (DPWH On-Going). Contractor on record: PASCAL CONST. Figures trace to dpwh.
Total Contract Cost

