Buildings and Facilities20CJ0083

LOCAL INFRASTRUCTURE PROGRAM CONSTRUCTION OF MULTI- PURPOSE BUILDING, BARANGAY SAN BARTOLOME, GERONA, TARLAC

LOCAL INFRASTRUCTURE PROGRAM CONSTRUCTION OF MULTI- PURPOSE BUILDING, BARANGAY SAN BARTOLOME, GERONA, TARLAC is a DPWH-tracked public work in Tarlac DEO, Region III. Reported contract value: ₱4,703,012.45. Status: Reported complete (DPWH). Contractor on record: MAYFLOWER CONST AND DEVELOPMENT CORP. Figures trace to dpwh.

Tarlac DEO, Region III
Region: Region III

Money Trail

1. Appropriation

No GAA appropriation line matched for this project at current confidence thresholds.

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-C-20-0016050

₱5,405,129.00 · FY2020

Source

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

7 projects · ₱160.9M total · 0 flags

Other projects by this contractor

No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG); SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD AND DRAINAGE AT MAGALANG, PAMPANGA

Pampanga 3rd DEO, Region III

2025₱49.0M
Past target date (DPWH On-Going)
No sat.

OFF-CARRIAGEWAY-SECONDARY ROADS; FRIENDSHIP CIRCUM RD (WEST CIRCUM RD)-K0082+(-035)-K0082+080, K0082=115-K0082+329, K0086+040-K0088+824, K0089+140-K0089+315 (WITH SOLAR LED STREET LIGHTS), ANGELES CITY, PAMPANGA

Pampanga 3rd DEO, Region III

2024₱46.9M
Reported complete (DPWH)
No sat.

Construction of Drainage System at Sta. Ines and Cabetican, Bacolor, Pampanga

BACOLOR (PAMPANGA), PAMPANGA, Region III

2022₱27.8M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF DOLORES - CONCEPCION ROAD, BACOLOR, PAMPANGA

Pampanga 1st DEO, Region III

2022₱18.5M
Reported complete (DPWH)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP): ): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BALUCUC MAIN ROAD, BRGY. BALUCUC, APALIT, PAMPANGA

Pampanga 1st DEO, Region III

2022₱9.4M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BARANGAY NUEVA VICTORIA, MEXICO, PAMPANGA

Pampanga 1st DEO, Region III

2024₱4.6M
Reported complete (DPWH)
View all 7 projects →

4. Implementation

Contract Amount

₱4,703,012.45

Progress

Reported complete (DPWH)

Start Date

October 22, 2020

Target End

January 19, 2021

5. Audit