MFO2: CONSTRUCTION OF FLOOD CONTROL SYSTEM, BUNTUN BRIDGE, SOLANA SIDE (DOWNSTREAM), STA. 0+160-STA. 0+338, MADDARULUG, SOLANA, CAGAYAN
MFO2: CONSTRUCTION OF FLOOD CONTROL SYSTEM, BUNTUN BRIDGE, SOLANA SIDE (DOWNSTREAM), STA. 0+160-STA. 0+338, MADDARULUG, SOLANA, CAGAYAN is a DPWH-tracked public work in Cagayan 3rd DEO, Region II. Reported contract value: ₱45,498,376.51. Status: Reported complete (DPWH). Contractor on record: EGB CONST CORP FORMERLY: EGB CONST. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost