CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF ILAYA FLOOD CONTROL STRUCTURE, STA. 000 + 588 - STA. 000 + 715.60 (L/S), STA. 000 + 640 - STA. 000 + 740 (R/S), STA. MARIA, ROMBLON
CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF ILAYA FLOOD CONTROL STRUCTURE, STA. 000 + 588 - STA. 000 + 715.60 (L/S), STA. 000 + 640 - STA. 000 + 740 (R/S), STA. MARIA, ROMBLON is a DPWH-tracked public work in Romblon DEO, Region IV-B. Reported contract value: ₱28,606,871.74. Status: Reported complete (DPWH). Contractor on record: LEGACY CONST CORP FORMERLY: LEGACY CONST 22465. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost


