Flood Control and Drainage16AB0074

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCT. AND DRAINAGE SYSTEM, SABO/FC PROJECTS ALONG LAOAG RIVER BASIN AND PRINCIPAL RIVERS, TRIBUTARIES-CONST. OF DIKE EXT. ALONG PAPA RIVER LEFT BANK, BRGY. STO. NINO NUEVA ERA, I.N

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCT. AND DRAINAGE SYSTEM, SABO/FC PROJECTS ALONG LAOAG RIVER BASIN AND PRINCIPAL RIVERS, TRIBUTARIES-CONST. OF DIKE EXT. ALONG PAPA RIVER LEFT BANK, BRGY. STO. NINO NUEVA ERA, I.N is a DPWH-tracked public work in Ilocos Norte 2nd DEO, Region I. Reported contract value: ₱19,013,519.53. Status: Reported complete (DPWH). Contractor on record: GACUTAN CONST INC FORMERLY: GACUTAN CONST 10789. Figures trace to dpwh.

Ilocos Norte 2nd DEO, Region I
Region: Region I

Money Trail

1. Appropriation

GAA FY2016 not yet loaded (source: DBM GAA)

2. Allotment

No SARO/NCA release rows linked to this project yet. See DBM release listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

DPWH ID 10789

52 projects · ₱2.6B total · 0 flags

Other projects by this contractor

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF PALACIAN FLOOD CONTROL STRUCTURE, SECTION 1, SAN AGUS

Isabela 4th DEO, Region II

2025₱106.0M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CORDON BYPASS ROAD, ISABELA

Region II, Region II

2024₱98.4M
Past target date (DPWH On-Going)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS ROAD AND DIVERSION ROADS - CORDON BYPASS ROAD, PACKAGE 1

Region II, Region II

2022₱97.9M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF VIRGONEZA FLOOD CONTROL STRUCTURE, SECTION 4, SAN AGUSTIN, ISABELA

Isabela 4th DEO, Region II

2024₱96.5M
Past target date (DPWH On-Going)

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS /FACILITIES - CONSTRUCTION OF STA. ISABEL FLOOD CONTROL STRUCTURE, SECTION 2, JONES, ISABELA

Isabela 4th DEO, Region II

2024₱96.5M
Reported complete (DPWH)

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS /FACILITIES - CONSTRUCTION OF MASAYA SUR FLOOD CONTROL STRUCTURE, SECTION 2, BRGY. MASAYA SUR, SAN AGUSTIN, ISABELA

Isabela 4th DEO, Region II

2024₱96.5M
Reported complete (100% progress, DPWH status On-Going)
View all 52 projects →

4. Implementation

Contract Amount

₱19,013,519.53

Progress

Reported complete (DPWH)

Start Date

March 29, 2016

Target End

September 7, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.