Construction/Maintenance of Flood Mitigation Structure and Drainage Systems, Construction of Flood Control Along Binahaan River, Sta. 2+800 to Sta. 3+143, Brgy. San Joaquin, Palo, Leyte
Construction/Maintenance of Flood Mitigation Structure and Drainage Systems, Construction of Flood Control Along Binahaan River, Sta. 2+800 to Sta. 3+143, Brgy. San Joaquin, Palo, Leyte is a DPWH-tracked public work in PALO (LEYTE), LEYTE, Region VIII. Reported contract value: ₱48,020,000.00. Status: Reported complete (DPWH). Contractor on record: LEDA CONST INC. Figures trace to sumbong.
Total Contract Cost






