CONST. OF FLOOD CONTROL ALONG ABRA RIVER, BANAOANG SECTION, KM. 000+000 - KM. 000+(-500), UPSTREAM
CONST. OF FLOOD CONTROL ALONG ABRA RIVER, BANAOANG SECTION, KM. 000+000 - KM. 000+(-500), UPSTREAM is a DPWH-tracked public work in Ilocos Sur 1st DEO, Region I. Reported contract value: ₱46,944,661.63. Status: Reported complete (DPWH). Contractor on record: SATRAP CONST CO INC. Figures trace to dpwh.
Total Contract Cost
