CONSTRUCTION OF TAWI-TAWI MAINLAND CIRCUMFERENTIAL ROAD, LAPID-LAPID-SUMANGAT-TARAWAKAN SECTION, BONGAO, TAWI-TAWI, STA.29+720.00 TO STA.31+540.00, NET LENGTH: 1,820.00 LN.M./ 1.820 KM/ 3.64 LANE KM
CONSTRUCTION OF TAWI-TAWI MAINLAND CIRCUMFERENTIAL ROAD, LAPID-LAPID-SUMANGAT-TARAWAKAN SECTION, BONGAO, TAWI-TAWI, STA.29+720.00 TO STA.31+540.00, NET LENGTH: 1,820.00 LN.M./ 1.820 KM/ 3.64 LANE KM is a DPWH-tracked public work in Region IX, Region IX. Reported contract value: ₱70,010,528.17. Status: Reported complete (DPWH). Contractor on record: M ABUBAKAR CONST AND ENGINEERING INC. Figures trace to dpwh.
Total Contract Cost
