CONSTRUCTION OF FLOOD CONTROL STRUCTURE, LONGOS BRIDGE 1ST APPROACH, DOWNSTREAM, CALAPAN CITY, ORIENTAL MINDORO
CONSTRUCTION OF FLOOD CONTROL STRUCTURE, LONGOS BRIDGE 1ST APPROACH, DOWNSTREAM, CALAPAN CITY, ORIENTAL MINDORO is a DPWH-tracked public work in Mindoro Oriental DEO, Region IV-B. Reported contract value: ₱95,151,691.45. Status: Past target date (DPWH On-Going). Contractor on record: SILVERWOLVES CONST CORP. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost

