ROAD UPGRADING (UNPAVED TO PAVED) OF SIOCON-SIRAWAI-SIBUCO-LIMPAPA ROAD, ZAMBOANGA DEL NORTE, 2ND DEO, CHAINAGE 9380 - CHAINAGE 9995, L = 615.00 LNM., (K 2120 + 380.00-K 2120 + 995.00) (NET LENGTH: 615.00 LN.M.)
ROAD UPGRADING (UNPAVED TO PAVED) OF SIOCON-SIRAWAI-SIBUCO-LIMPAPA ROAD, ZAMBOANGA DEL NORTE, 2ND DEO, CHAINAGE 9380 - CHAINAGE 9995, L = 615.00 LNM., (K 2120 + 380.00-K 2120 + 995.00) (NET LENGTH: 615.00 LN.M.) is a DPWH-tracked public work in Region IX, Region IX. Reported contract value: ₱94,955,374.61. Status: Reported complete (DPWH). Contractor on record: M ABUBAKAR CONST AND ENGINEERING INC. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
