CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER PHASE I, BARANGAY BANGBANGAR, BANGUED, ABRA
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER PHASE I, BARANGAY BANGBANGAR, BANGUED, ABRA is a DPWH-tracked public work in Abra DEO, Cordillera Administrative Region. Reported contract value: ₱91,714,177.48. Status: Past target date (DPWH On-Going). Contractor on record: MG SAMIDAN CONST 33234. Figures trace to dpwh.
Total Contract Cost
