CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM-CONSTRUCTION OF BATERIA RIVER FLOOD CONTROL (SUBA TINAGO), TINANGNAN, TUBIGON, BOHOL
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM-CONSTRUCTION OF BATERIA RIVER FLOOD CONTROL (SUBA TINAGO), TINANGNAN, TUBIGON, BOHOL is a DPWH-tracked public work in Bohol 1st DEO, Region VII. Reported contract value: ₱47,443,187.50. Status: Reported complete (DPWH). Contractor on record: BNYU DEVELOPMENT CORP FORMERLY:BNYU ENT. Figures trace to dpwh.
Total Contract Cost
