Construction of Flood Mitigation Structure23KC0045

Construction of Flood Mitigation Structure along Misamis Oriental-Bukidnon-Agusan Road (Downstream) of Siloo Bridge with slope protection, Malitbog, Bukidnon

Construction of Flood Mitigation Structure along Misamis Oriental-Bukidnon-Agusan Road (Downstream) of Siloo Bridge with slope protection, Malitbog, Bukidnon is a DPWH-tracked public work in MALITBOG (BUKIDNON), BUKIDNON, Region X. Reported contract value: ₱10,147,900.00. Status: Reported complete (DPWH). Contractor on record: RAMISES CONST. Figures trace to sumbong.

MALITBOG (BUKIDNON), BUKIDNON, Region X
Region: Region X

Money Trail

1. Appropriation

Probable match · score 100%

UACS
18001
Amount
₱10,355,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure along Misamis Oriental-Bukidnon-Agusan Road (Downstream) of Siloo Bridge with slope protection, Malitbog, Bukidnon
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Bukidnon 3rd District Engineering Office · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

4. Implementation

Contract Amount

₱10,147,900.00

Progress

Reported complete (DPWH)

Start Date

February 20, 2023

Target End

July 30, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.