Roads22PA0025

REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, ABRA-KALINGA ROAD-K0436+615-K0436+700

REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, ABRA-KALINGA ROAD-K0436+615-K0436+700 is a DPWH-tracked public work in Abra DEO, Cordillera Administrative Region. Reported contract value: ₱48,997,153.70. Status: Reported complete (DPWH). Contractor on record: ROCK-WBL CONST CORP FOR: ROCK-WBL CONST TRADING. Figures trace to dpwh.

Abra DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱42,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Banglolao-Labon Flood Control Structure, Bucay, Abra
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Agency-level releases for FY2022, not tied to this contract

Abra DEO · SARO 1,577 (₱362,967,860,598.00) · NCA 828 (₱622,683,863,078.47)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

114 projects · ₱9.4B total · 0 flags

Other projects by this contractor

No sat.

REHABILITATION OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG TDC-PAGDANAN ROAD, STA. 9+318-STA. 9+495; STA. 9+864-STA. 10+055, PALAWAN

Region IV-B, Region IV-B

2022₱208.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BENGUET NUEVA VIZCAYA RD, K0275+324 - K0275+505

Cordillera Administrative Region, Cordillera Administrative Region

2023₱193.0M
Reported complete (DPWH)
No sat.

SPECIAL ROAD FUND- MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD SAFETY DEVICES ALONG A) CALASIAO OLD RD- K0204+000-K0204+725, K0204+741-K0205+000, K0205+000-K0205+108, K0205+120-K0206+000, K0206+000-K0207+000, K0207+000-K0207

Region I, Region I

2023₱193.0M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - MAHARLIKA HIGHWAY - K1378+330 - K1378+450, K1378+600 - K1378+700, K1379+070 - K1379+390, K1379+805 - K1379+850, K1388+550 - K1388+600, K1399+580 - K1399+635, K1403+140 - K1403+190, DAVAO DE ORO

Region XI, Region XI

2025₱185.7M
Past target date (DPWH On-Going)
No sat.

REHABILITATION OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG TDC-PAGDANAN ROAD, STA. 9+617-STA. 9+813; STA. 8+266-STA. 8+400, PALAWAN

Region IV-B, Region IV-B

2022₱152.9M
Reported complete (DPWH)
No sat.

SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF ROAD SAFETY DEVICES ALONG GAPAN - FORT MAGSAYSAY ROAD, PEÑARANDA SECTION, NUEVA ECIJA

Nueva Ecija 2nd DEO, Region III

2025₱144.0M
Past target date (DPWH On-Going)
View all 114 projects →

4. Implementation

Contract Amount

₱48,997,153.70

Progress

Reported complete (DPWH)

Start Date

March 10, 2022

Target End

October 2, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.