CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG IBULAO RIVER, STA. 329+250 - STA. 330+000, OLILICON, LAGAWE, IFUGAO
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG IBULAO RIVER, STA. 329+250 - STA. 330+000, OLILICON, LAGAWE, IFUGAO is a DPWH-tracked public work in Ifugao 1st DEO, Cordillera Administrative Region. Reported contract value: ₱52,577,355.18. Status: Past target date (DPWH On-Going). Contractor on record: DJY CONST. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
