CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF RIVER CONTROL ALONG PAGSANJAN RIVER, BRGY. SAN ISIDRO, PAGSANJAN, LAGUNA, 4TH LD
CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF RIVER CONTROL ALONG PAGSANJAN RIVER, BRGY. SAN ISIDRO, PAGSANJAN, LAGUNA, 4TH LD is a DPWH-tracked public work in Laguna 1st DEO, Region IV-A. Reported contract value: ₱46,508,650.82. Status: Reported complete (DPWH). Contractor on record: NEWBIG FOUR J CONST INC FORMERLY: FOUR J CONST 15104. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
