REHABILITATION OF EXISTING DIKE ALONG RIO CHICO RIVER, (MATAYUMTAYUM SECTION, RIGHT BANK), U/S OF RIO CHICO BRIDGE PHASE 2, STA. 14+837.48 TO STA. 15+278.69, LA PAZ, TARLAC
REHABILITATION OF EXISTING DIKE ALONG RIO CHICO RIVER, (MATAYUMTAYUM SECTION, RIGHT BANK), U/S OF RIO CHICO BRIDGE PHASE 2, STA. 14+837.48 TO STA. 15+278.69, LA PAZ, TARLAC is a DPWH-tracked public work in Tarlac 2nd DEO, Region III. Reported contract value: ₱96,410,247.10. Status: Past target date (DPWH On-Going). Contractor on record: AMETHYST HORIZON BUILDERS AND GEN CONTRACTOR AND DEVELOPMENT CORP REVOKED 49129. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost