CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUNCALALAN RIVER, BARANGAY MALANANG SECTION (PACKAGE 1), OPOL MISAMIS ORIENTAL
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUNCALALAN RIVER, BARANGAY MALANANG SECTION (PACKAGE 1), OPOL MISAMIS ORIENTAL is a DPWH-tracked public work in Misamis Oriental 2nd DEO, Region X. Reported contract value: ₱48,932,490.52. Status: Reported complete (DPWH). Contractor on record: LYD CONST. Figures trace to dpwh.
Total Contract Cost
