CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAGTAS RIVER, BARANGAY MALIBONG BATA (PUROK 3), PANDI, BULACAN
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAGTAS RIVER, BARANGAY MALIBONG BATA (PUROK 3), PANDI, BULACAN is a DPWH-tracked public work in Bulacan 1st DEO, Region III. Reported contract value: ₱74,110,834.66. Status: Past target date (DPWH On-Going). Contractor on record: TRIPLE 8 CONST. Figures trace to dpwh.
Total Contract Cost


