Construction (Completion) of River Control Structure and Drainage System, Bangon River Control, Tablas Island, Romblon
Construction (Completion) of River Control Structure and Drainage System, Bangon River Control, Tablas Island, Romblon is a DPWH-tracked public work in ODIONGAN (ROMBLON), ROMBLON, Region IV-B. Reported contract value: ₱106,147,622.30. Status: Reported complete (DPWH). Contractor on record: LEGACY CONST CORP FORMERLY: LEGACY CONST. Figures trace to sumbong.
Total Contract Cost



