Bridges22FJ0009

BRIDGE PROGRAM- WIDENING OF PERMANENT BRIDGES, ARMENIA BR. (B00099MT) ALONG MASBATE- CATAINGAN- PLACER RD.

BRIDGE PROGRAM- WIDENING OF PERMANENT BRIDGES, ARMENIA BR. (B00099MT) ALONG MASBATE- CATAINGAN- PLACER RD. is a DPWH-tracked public work in Masbate 3rd DEO, Region V. Reported contract value: ₱8,815,889.71. Status: Reported complete (DPWH). Contractor on record: 3R3M CONST AND SUPPLY CORP FORMERLY: 3R3M CONST AND SUPPLY. Figures trace to dpwh.

Masbate 3rd DEO, Region V
Region: Region V

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱36,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Concrete Revetment at Buenavista River, Brgy. Magsaysay Uson, Masbate
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Agency-level releases for FY2022, not tied to this contract

Masbate 3rd DEO · SARO 1,577 (₱362,967,860,598.00) · NCA 828 (₱622,683,863,078.47)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

71 projects · ₱974.4M total · 0 flags

Other projects by this contractor

No sat.

FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BITO RIVER (DOWNSTREAM), BRGY. CORBADA, SAN FERNANDO, MASBATE.

Masbate 1st DEO, Region V

2024₱49.0M
Reported complete (100% progress, DPWH status On-Going)
No sat.

Construction of Dimasalang Flood Control, Barangay G. Aliño, Dimasalang, Masbate

DIMASALANG (MASBATE), MASBATE, Region V

2024₱48.9M
Reported complete (DPWH)
No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE- CONSTRUCTION OF CANOMAY FLOOD CONTROL, BARANGAY CANOMAY, DIMASALANG, MASBATE

Masbate 3rd DEO, Region V

2024₱48.9M
Reported complete (DPWH)
No sat.

FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SHORE PROTECTION STRUCTURE, LAGUNDI, BARANGAY BURGOS, BATUAN, MASBATE.

Masbate 1st DEO, Region V

2025₱47.5M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - JCT. TAWAD-BALUD ROAD (S00023MT) K0039+670 - K0039+812, K0039+882 - K0040+019

Masbate 2nd DEO, Region V

2025₱38.4M
Past target date (DPWH On-Going)
No sat.

OO1: NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- SECONDARY ROADS, BUENAVISTA- KAWAYAN RD- K0050+729- K0051+400

Masbate 3rd DEO, Region V

2024₱34.2M
Reported complete (DPWH)
View all 71 projects →

4. Implementation

Contract Amount

₱8,815,889.71

Progress

Reported complete (DPWH)

Start Date

February 14, 2022

Target End

February 28, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.