CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MALABON-TULLAHAN RIVER, BARANGAY TAÑONG TO BRGY. POTRERO, MALABON CITY (PHASE 7)
CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MALABON-TULLAHAN RIVER, BARANGAY TAÑONG TO BRGY. POTRERO, MALABON CITY (PHASE 7) is a DPWH-tracked public work in Malabon-Navotas DEO, National Capital Region. Reported contract value: ₱0.00. Status: Ongoing (DPWH-reported) (For Procurement (DPWH-reported)). Contractor on record: Contractor not linked in this database. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
