Roads19CD0227

ASSET PRESERVATION CONSTRUCTION / UPGRADING /REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS NCR/BULACAN BDRY.-BIGTE-IPO DAM ROAD K0039+000 K0039+453

ASSET PRESERVATION CONSTRUCTION / UPGRADING /REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS NCR/BULACAN BDRY.-BIGTE-IPO DAM ROAD K0039+000 K0039+453 is a DPWH-tracked public work in Bulacan 2nd DEO, Region III. Reported contract value: ₱8,072,306.88. Status: Reported complete (DPWH). Contractor on record: 729 CONST INC FORMERLY 722 CONST INC 21923. Figures trace to dpwh.

Bulacan 2nd DEO, Region III
Region: Region III

Money Trail

1. Appropriation

GAA FY2019 not yet loaded (source: DBM GAA)

2. Allotment

No SARO/NCA release rows linked to this project yet. See DBM release listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

DPWH ID 21923

207 projects · ₱6.0B total · 0 flags

Other projects by this contractor

No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF REVETMENT AT MALANGAAN SECTION (SEGMENT A), DONA REMEDIOS TRINIDAD, BULACAN

Region III, Region III

2024₱96.5M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN JOSE RIVER, STA. 08+320 STA. 08+620 (PARADA - SAN VICENTE SECTION), SANTA MARIA, BULACAN

Bulacan 2nd DEO, Region III

2025₱96.5M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUYAN RIVER AND ITS TRIBUTIARIES, STA 04+000 STA 04+300 (LIPUTAN CONSTANTINO SECTION, RIGHT SIDE), MEYCAUAYAN, BULACAN

Bulacan 2nd DEO, Region III

2024₱96.2M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF RIVERBANK PROTECTION STRUCTURE ALONG BALAONG RIVER (SITIO BROWN BRIDGE UPSTREAM), PACKAGE 3, SAN MIGUEL, BULACAN

Bulacan 3rd DEO, Region III

2025₱95.1M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF RIVERBANK PROTECTION STRUCTURE ALONG BALAONG RIVER (SITIO BROWN BRIDGE UPSTREAM), PACKAGE 4, SAN MIGUEL, BULACAN

Bulacan 3rd DEO, Region III

2025₱95.1M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF REVETMENT AT MALANGAAN SECTION (SEGMENT B), DONA REMEDIOS TRINIDAD, BULACAN

Region III, Region III

2024₱95.1M
Past target date (DPWH On-Going)
View all 207 projects →

4. Implementation

Contract Amount

₱8,072,306.88

Progress

Reported complete (DPWH)

Start Date

July 11, 2019

Target End

November 14, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.