CONSTRUCTION OF RUBBLE DIKE ALONG BAYLAO RIVER CONTROL/DRAINAGE SYSTEM ALONG CCR, BAYLAO BRIDGE
CONSTRUCTION OF RUBBLE DIKE ALONG BAYLAO RIVER CONTROL/DRAINAGE SYSTEM ALONG CCR, BAYLAO BRIDGE is a DPWH-tracked public work in Camiguin DEO, Region X. Reported contract value: ₱46,550,000.00. Status: Reported complete (DPWH). Contractor on record: MINDANAO ROCK. Figures trace to dpwh.
Total Contract Cost
