CONSTRUCTION OF RIVER CONTROL ALA RIVER LAMBAYONG (RIVER BANK RPOTECTION REVETMENT), MATIOMPONG SECTION, BRGY. MATIOMPONG SECTION A 0+000-0+290, SECTION B 0+490-0+630
CONSTRUCTION OF RIVER CONTROL ALA RIVER LAMBAYONG (RIVER BANK RPOTECTION REVETMENT), MATIOMPONG SECTION, BRGY. MATIOMPONG SECTION A 0+000-0+290, SECTION B 0+490-0+630 is a DPWH-tracked public work in Sultan Kudarat 1st DEO, Region XII. Reported contract value: ₱46,738,502.92. Status: Reported complete (DPWH). Contractor on record: GEMMA CONST SUPPLY INC FORMERLY:GEMMA CON. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
