CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG HANAGDONG RIVER, PROTECTING HANAGDONG BRIDGE/ BRGY. HANAGDONG, MALIMONO, SURIGAO DEL NORTE
CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG HANAGDONG RIVER, PROTECTING HANAGDONG BRIDGE/ BRGY. HANAGDONG, MALIMONO, SURIGAO DEL NORTE is a DPWH-tracked public work in Surigao del Norte 2nd DEO, Region XIII. Reported contract value: ₱96,499,543.65. Status: Reported complete (DPWH). Contractor on record: A T DUMLAO CONST INC FORMERLYANDONI T D. Figures trace to dpwh.
Total Contract Cost

