REHAB./REPAIR OF DAMAGED SLOPE/BANK PROTECTION OF ADGAWAN RIVER PROTECTING ADGAWAN BRIDGE APPROACH A (INCL. ROW) 0+000 - 0+140 APPROACH A UPSTREAM, LA PAZ, AGUSAN DEL SUR
REHAB./REPAIR OF DAMAGED SLOPE/BANK PROTECTION OF ADGAWAN RIVER PROTECTING ADGAWAN BRIDGE APPROACH A (INCL. ROW) 0+000 - 0+140 APPROACH A UPSTREAM, LA PAZ, AGUSAN DEL SUR is a DPWH-tracked public work in Agusan del Sur 2nd DEO, Region XIII. Reported contract value: ₱48,800,000.00. Status: Reported complete (DPWH). Contractor on record: C'ZARLES CONST. Figures trace to dpwh.
Total Contract Cost

