CONSTRUCTION OF TANGYAN FLOOD CONTROL STRUCTURE WITH ACCESS ROAD, PHASE II, ALONG BARANGAY LUBACAN-BARANGAY ANONO-O SECTION, GUIMBAL, ILOILO
CONSTRUCTION OF TANGYAN FLOOD CONTROL STRUCTURE WITH ACCESS ROAD, PHASE II, ALONG BARANGAY LUBACAN-BARANGAY ANONO-O SECTION, GUIMBAL, ILOILO is a DPWH-tracked public work in Iloilo 1st DEO, Region VI. Reported contract value: ₱29,649,749.61. Status: Past target date (DPWH On-Going). Contractor on record: RINEL CONST SERVICES 53892. Figures trace to dpwh.
Total Contract Cost
