CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, KINABUTAN RIVER FLOOD CONTROL (1ST APPROACH UPSTREAM)/BRGY. LUNA, SURIGAO CITY, SURIGAO DEL NORTE, K 0+111 - K 0+394
CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, KINABUTAN RIVER FLOOD CONTROL (1ST APPROACH UPSTREAM)/BRGY. LUNA, SURIGAO CITY, SURIGAO DEL NORTE, K 0+111 - K 0+394 is a DPWH-tracked public work in Surigao del Norte 2nd DEO, Region XIII. Reported contract value: ₱29,339,120.54. Status: Reported complete (DPWH). Contractor on record: CTB CONST AND DEVELOPMENT CORP FORMERLY : CTB ENGINEERING CONST. Figures trace to dpwh.
Total Contract Cost
