CONSTRUCTION OF SLOPE PROTECT AND SABO DAM, SIBALOM RIVER IRRIGATION SYSTEM (RIS), LEON, ILOILO
CONSTRUCTION OF SLOPE PROTECT AND SABO DAM, SIBALOM RIVER IRRIGATION SYSTEM (RIS), LEON, ILOILO is a DPWH-tracked public work in Iloilo 4th DEO, Region VI. Reported contract value: ₱29,099,264.46. Status: Reported complete (DPWH). Contractor on record: G UY CONST. Figures trace to dpwh.
Total Contract Cost
