Flood Control and Drainage20PI0064

CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CHICO RIVER, CHAKCHAKAN SECTION, BONTOC ILI, BONTOC, MT. PROVINCE

CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CHICO RIVER, CHAKCHAKAN SECTION, BONTOC ILI, BONTOC, MT. PROVINCE is a DPWH-tracked public work in Mountain Province 1st DEO, Cordillera Administrative Region. Reported contract value: ₱4,900,000.00. Status: Reported complete (DPWH). Contractor on record: E T LATAWAN CONST 13919. Figures trace to dpwh.

Mountain Province 1st DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Money Trail

1. Appropriation

No GAA appropriation line matched for this project at current confidence thresholds.

2. Allotment

No SARO/NCA release rows linked to this project yet. See DBM release listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

DPWH ID 13919

46 projects · ₱2.0B total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF CANAN BRIDGE, LA PAZ, ABRA

Abra DEO, Cordillera Administrative Region

2024₱140.2M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF CALABA VIADUCT PHASE I, CALABA, BANGUED, ABRA

Abra DEO, Cordillera Administrative Region

2024₱139.9M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF CALABA VIADUCT PHASE 2, CALABA, BANGUED, ABRA

Abra DEO, Cordillera Administrative Region

2024₱139.8M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF OTIP BRIDGE, TUBO, ABRA

Abra DEO, Cordillera Administrative Region

2024₱138.1M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF SINALANG-PALAO BRIDGE APPROACHES, PALAO, BANGUED, ABRA

Abra DEO, Cordillera Administrative Region

2024₱137.5M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF SINALANG-PALAO BRIDGE, BANGUED, ABRA

Abra DEO, Cordillera Administrative Region

2024₱137.4M
Past target date (DPWH On-Going)
View all 46 projects →

4. Implementation

Contract Amount

₱4,900,000.00

Progress

Reported complete (DPWH)

Start Date

October 28, 2020

Target End

January 25, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.